hammer blow造句

"hammer blow"是什么意思   

例句与造句

  1. Then membership declined under the hammer blows of an organized employer campaign until 1911, when it began slowly to mount again .
    此外,直到1911年,在组织起来的雇主们的沉重打击下,它的会员数有所减少。1911年又开始逐渐上升。
  2. Sledge - hammer blow
    强有力的无情打击
  3. Your warrior / elementalist can set enemies up with distance spells , then knock them down with a hammer blow
    战士/元素使可以用远距离法术拉怪,再近距离用大锤猛砸。
  4. Pacific valves can provide either impact handwheels or clampon hammer blow handwheel adapters
    美国太平洋阀门公司即可提供冲击手轮,也可提供夹紧式锤击手轮接合器。
  5. Then membership declined under the hammer blows of an organized employer campaign until 1911 , when it began slowly to mount again
    此外,直到1911年,在组织起来的雇主们的沉重打击下,它的会员数有所减少。 1911年又开始逐渐上升。
  6. It's difficult to find hammer blow in a sentence. 用hammer blow造句挺难的
  7. Life is constantly pounding you from the outside with millions of hammer blows , but you have the last word as to how those blows will change you
    人生中,经常有无数来自外部的打击,但这些打击终究会对你产生怎样的影响,最终决定权在你手中。
  8. Life is constantly pounding you from the outside with millions of hammer blows , but you have the last word as to how those blows will change you
    人生中,经常有无数来自外部的打击,但这些打击究竟会对你产生怎样的影响,最终决定权在你手中。
  9. " she was probably the last one to be killed " , so he analysed . until then huang wenyi had been killing his relatives each in just one hammer blow , and after killing four in a row he would have become physically exhausted
    “她可能是最后一个被杀害的” ,他分析此前黄文义锤杀亲人时一锤下去对方就已毙命,而在连续杀死四人后体力严重透支。
  10. Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program , the study of composite wall , with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained , also the influence to wall ' s stiffness and bearing capacity by kinds of factors , including wall ' s shear span ratio , member ' s section , bar arrangement , etc . based on the hammer blow test and stiffness test , a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed
    在对密肋复合墙板运用ansys ~ ( ( ? ) )程序进行数值模拟、分析验证的基础上,对典型组合墙体在不同连接构造和不同荷载效应组合作用下的受力形态和破坏模式进行研究;计算分析了复合墙体剪跨比、边框柱截面尺寸、边框柱配筋大小以及墙板内肋梁肋柱配筋等诸多因素对密肋复合墙体承载力及刚度的影响,得出其变化规律。

相关词汇

  1. "hammer beams"造句
  2. "hammer bit"造句
  3. "hammer blast"造句
  4. "hammer blasts"造句
  5. "hammer block"造句
  6. "hammer blows"造句
  7. "hammer body"造句
  8. "hammer bowling"造句
  9. "hammer box"造句
  10. "hammer boy"造句
电脑版繁體版English日本語

Copyright © 2023 WordTech Co.